PROJ 420 Week 1 Selecting Project Week 2 Project Sizing and Stakeholder Analysis Week 3 Project Risk Breakdown Answer

PROJ 420 Week 1 Selecting Project Week 2 Project Sizing and Stakeholder Analysis Week 3 Project Risk Breakdown Answer

PROJ420_Week 1: Selecting a Project_Week 2: Project Sizing and Stakeholder Analysis Week 3: Project Risk Breakdown Structure Answer

Deliverables

Week 1: Selecting a Project
During Week 1, you will select a project for your risk management plan course project. The project can be one that you are working on as part of your regular job, a case study you have completed in the past, or a project that you want to plan, either business or personal. You will choose your own project so that you will be very familiar with the project and understand all of its various elements. The project request will be submitted as a graded assignment.
To select your project, submit a description of your project using the Week 1 Course Project Proposal & Outline Template (PROJ420_W1_ProposalAndOutline.docx) in Doc Sharing.
Submit your assignment to the Week 1 Course Project Dropbox located on the silver tab at the top of this page. For instructions on how to use the Dropbox, read these Step-by-Step Instructions or watch this Dropbox Tutorial. See Syllabus/”Due Dates for Assignments & Exams” for due date information.
You will receive a post in your Dropbox that will indicate approval to proceed.
This submission must be well presented because this is a required assignment that will receive a grade in Gradebook. The project paper is a required item for successful completion of this class. If you do not submit a project selection, you will not be able to proceed with assignments, as each week builds upon the last. We will discuss the various steps in developing the RMP for your project in our weekly threaded discussions. All submissions for a grade will also be evaluated for grammar and spelling.
Week 2: Project Sizing and Stakeholder Analysis
Your course project milestone for Week 2 will be to develop your Project Sizing and Stakeholder Analysis.
To do this, use the Week 2 Course Project Assignment Template (PROJ420_W2_AssignmentTemplate.docx) in Doc Sharing.
Week 3: Project Risk Breakdown Structure
For your third course project milestone, develop a Risk Breakdown Structure.
To do this, use the Week 3 Course Project Assignment Template (PROJ420_W3_AssignmentTemplate.docx) in Doc Sharing.
In order to keep the RBS manageable, identify ten risks from your project to be included in your RBS.
Week 4: Probability-Impact Matrix
This week for your course project milestone, submit a Probability-Impact Matrix for the project you selected based on the top ten risks you identified in your RBS in Week 3.
To do this, use the Week 4 Course Project Assignment Template (PROJ420_W4_PIMatrixTemplate.xlsx) in Doc Sharing.
Week 5: Risk Register
Develop and submit a Risk Register based on the ten risks you have assessed within the project you selected. Your Register should have four sections:
1. the project title
2. the risk description
3. the impact and probability rating
4. the planned response
Note that there is no template for this week’s assignment.
Week 6: Summary Risk Report
This week, you are to develop a Summary Risk Report based on the project you have selected and have been assessing.
Refer to Figure B-14 in Appendix B on page 221 in your Practical Project Risk Management: The ATOM Methodology text. The report is a summary, so please keep your assignment in that format. Five pages is the suggested maximum length.
Submit your assignment to the Week 6 Course Project Dropbox located on the silver tab at the top of this page. For instructions on how to use the Dropbox, read these Step-by-Step Instructions or watch this Dropbox Tutorial. See Syllabus/”Due Dates for Assignments & Exams” for due date information.
Week 7: Course Project Final Paper (The RMP)
Your final paper for the course project (the RMP) is due in Week 7.
Please reference the template found in Appendix A, page 197, of the Practical Project Risk Management: The ATOM Methodology text.
The course project paper is your Risk Management Plan (RMP).

For getting the instant digital download solution, Please click on the “PURCHASE” link below to get PROJ420_Project Risk Management Course Project Week Wise Risk Management Plan_Complete_Answer

For instant digital download of the above solution or tutorial, please click on the below link and make an instant purchase. You will be guided to the PAYPAL Standard payment page wherein you can pay and you will receive an email immediately with a download link.

In case you find any problem in getting the download link or downloading the tutorial, please send us an email on mail@genietutorial.com

Zip Icon